How to install the lifting column? Tongda Zhi explains the steps of the lifting column installation process

The choice of installing the lifting column is generally to prevent the vehicle from forcibly passing through restrictions on passing vehicles, so that pedestrians and electric vehicles can pass well, and the traffic order and the safety of major facilities and places are guaranteed. For the installation of the lifting column, many security personnel have some doubts, so how to install the lifting column in the end, what is the process flow? Today, Tongda Zhi explained the installation steps and process specifications of the lifting column in detail:
1. Construction site materials and equipment preparation before installation of Tongdazhi lifting column
1. Stone: The bottom of the foundation ditch is covered with a layer of 3-5 cm in diameter and 20 cm in thickness.
2. Sand: 20 cm above the water seepage layer of the foundation ditch. The amount of stone and sand is calculated by multiplying the length of the ditch by the width of the ditch. The width of the road pile equipment is 1 m, and the distance between the ditch and the center of the installed pile is 1 m. Or according to the length of the site construction.
3. Reinforcement: The underground piles of the road piles are used to reinforce the welded steel bars. The diameter of the 1.4mm threaded steel bars is 6 pieces according to the length of the groove. According to the width of the groove, each of the pre-embedded barrels is slightly longer when welding. It needs to be inserted into the four walls of the foundation trench, which is stable and not displaced after the equipment is buried in the barrel.
4. Concrete: Calculated according to the base area of ​​the base and multiplied by 90cm, the pavement recovery cement or asphalt stone is calculated according to the field usage.
5, 1 inch thick-walled polyethylene plastic pipe, according to the distance of each road pile to the control box on the site and make a reservation, each road pile is the root, the control box is required to be buried between the power box and the cable box. Pipe protection.
6, cable: control box input main voltage 220v (RVV 3 * 4) 380V input: (RVV 3 * 4 + 1), cable. Control box to road pile equipment cable (the road pile with warning light cable is RVV7*2.5; the road pile without warning light cable is RVV5*2.5; also can use two lines, road pile with warning light RVV3*2.5+ RVV4*1.0; road pile without warning light RVV3*2.5+RVV2*1.0), one for each road pile. One roadblock equipment grounding wire (BVR4). The required cable lengths are reserved at both ends of the distance between the site control box road pile equipment and the control box to the power supply equipment.
7. Cable wiring tape: electrical plastic tape, high-pressure waterproof tape, asphalt tape, prepared according to the number of field devices.
8. Tools and equipment: welding equipment, pavement cutting equipment, electric picks, foundation trench excavation machinery, and other electrical and civil construction tools and equipment, and on-site safety construction facilities.
9. After the on-site installation materials and our company's equipment are ready, follow the relevant safety construction standards and do site construction safety measures. Determine the installation location of the road pile equipment: no pipelines, cables and other facilities that affect the construction, refer to the construction standards of the relevant local facilities.
10. After the site has the construction conditions, determine the installation and construction date, arrange the technicians as needed, and guide the installation remotely or on site.
Second, Tongda Zhi lifting column equipment installation foundation construction standards
1. Foundation trench excavation construction: foundation groove depth (1.4 m), width (0.7 m - 1 m), length (the total length of the center distance installed by the road pile equipment is 1 m). It is required to do the necessary construction plan before construction to avoid damage to the road surface and other facilities outside the construction area.
2. Draw the construction area of ​​the foundation ditch on the ground of the installation site according to the design plan. If the road surface is a hard pavement such as cement or asphalt, first use the electric saw to saw along the four sides of the construction area of ​​the foundation ditch, and then use the electric raft. The electric equipment removes the ground above the area to avoid affecting the ground outside the construction site, which brings inconvenience to the road surface after installation.
3, the basic ditch requires four walls vertical ground leveling specifications.
4. If there is frequent water accumulation at the construction site or the groundwater level is high, our technicians will set up the corresponding drainage facilities according to the site conditions. If our personnel are not on site, please contact our technical staff to develop a solution.
5. After the foundation trench is dug, the bottom is filled with 3-5 cm of stone, and the thickness of the seepage layer is 20cm----30cm and then filled with fine sand with a thickness of 10--20cm. Evenly flat, does not affect the placement of the ultra-flat base of the next pre-buried barrel.
Third, the equipment embedded parts installation
1. Horizontal line for laying equipment: along the center of the vertical ditch of the foundation ditch, draw a straight line with the rope at both ends and the horizontal groove width. The horizontal groove width direction is drawn according to the center of each equipment installation position and the ground level. The device is equipped with a crosshair. It is required that the ends of each line be fixed with steel nails and not displaced.
2. Backfill or clean the fine sand at the bottom of the foundation tank according to the height of the pre-embedded barrel of each equipment, so that the height of the pre-embedded barrel of each equipment above the basic tank is the same.
3. Ultra-flat base installation: Open the equipment packing box, take out the pre-buried barrel super flat base, install the adjustment anchor bolts on the base, four on each base, put the prepared pre-embedded barrel super flat base into the foundation At the bottom of the trough, the ground feet are facing downwards, and the vertical position of each equipment installation position is perpendicular to the intersection line. The height of the pre-buried barrel super flat bottom and the upper cross line is determined by the height of the equipment pre-buried barrel. The horizontal ruler is super flat in the cross direction, and the installation of the super flat bottom plate must be horizontal, highly accurate, and firm and not displaced.
4. Equipment disassembly: After the pre-buried barrel super flat base is installed, the overall road pile equipment will be placed vertically to avoid the loss of personnel and equipment. Disassemble the top cover, flange, column and power unit of the equipment leaving only the pre-buried barrel section. (Refer to product technical guidance)
5. Pre-buried barrel placement: Place the pre-embedded barrel vertically on the ultra-flat bottom plate at the bottom of the foundation trough. It is required to be consistent with the upper horizontal line to ensure that the center of the pre-embedded barrel is consistent with the center line and is vertical. It is simple to fix with steel bar welding, so as to avoid the pipe threading of the lower pipe.
Fourth, laying the threading pipe and threading
1. Prefabricated threading pipe laying: Pay special attention to the existing buried pipe on both sides of the equipment pre-buried bucket. The lower part is the drain pipe and the upper part is the electric wire pipe. The threading pipe can not be connected to the lower drain pipe, otherwise the equipment Other units will not be installed ! ! ! ! ! Insert one end of the 1 inch threading tube into the pre-embedded barrel and hold it with waterproof tape. Insert the depth to about 30MM, and the other end to the equipment control box, one for each pre-embedded barrel. When laying the threading pipe, it is required to ensure smooth threading and cable replacement when there is a fault.
2. Threading and grounding: Each barrier device is individually driven by a cable (the barrier is illuminated with RVV7*2.5 cable; the non-lighting strap is RVV5*2.5 cable or other specification cable), to the control. A separate threading pipe is required for each cable. It is required that no cable is inserted into the pre-embedded bucket, and it is taken out from the pre-buried bucket to the top of the pre-embedded bucket, and is 1.3 meters above the top of the pre-embedded bucket. 0.7 m, the grounding wire uses a BVR24 alone. One end of the wire is connected to the grounding bar of the control box, and the other end is connected to the welded steel bar of the pre-embedded copper. A m8 screw is welded on the reinforcing bar and pressed with a screw cap.
3. Control box power supply connection: a cable is laid from the control box to the power take-off box. The input voltage of the control box is 380V, RVV4*4 is selected, 220V is selected as 3*4 cable, and the threading pipe is separately prepared. The cable is required to be inside the control box. The lead is reserved for 1 meter, and the length of the power take-off box is reserved according to the terminal in the power take-off box.
4. External controlled button box wiring: If the user requests to configure external manual button control, lay a (RVV*1.5) cable along the control box to the manual control box, and lay the threading tube separately, and the cable at the bottom of the control box must be reserved. Less than 1.2 meters, there are external control terminals in the control box, open, close, stop, and common four terminals. The three lines of opening, closing and stopping are respectively connected to the corresponding normal opening points of the manual control box, and the common line is connected at the same time. At the other end of the normally open point corresponding to the three buttons
V. Welding pre-embedded barrel reinforcement
1. Rebar welding process: After the cable is laid, it is necessary to reconfirm the intersection line between the pre-embedded barrel and the foundation ditch, and start welding after height, vertical and concentric level.
2. The first layer; welded with a steel bar into a well-shaped fixing frame centered on the pre-buried barrel, welded and firmly welded three layers, requiring two ends of the steel bar to be inserted into the four walls of the foundation ditch, the first layer is from the bottom of the pre-buried barrel
30 cm, after the welding is completed, the pre-buried barrel is corrected again, and it is determined that the second layer is welded after being prepared, otherwise the pre-buried barrel cannot be corrected after the second layer is welded.
3. The second layer is the same as the first one, welded in the middle part of the pre-embedded barrel, and the third time is 20 cm from the upper part of the pre-embedded barrel (the welding method of the steel bar can refer to the product technical guide to install the welding schematic)
Sixth, the wiring part of the process
1. Road pile equipment power unit reserved line: The road pile power unit motor is a three-core cable line followed by a blue line. The brown line, the flower line and the solenoid valve are two black lines, and there is a two-core spiral light line with warning lights. There are seven lines, five lines without warning lights, and the pre-embedded barrel fixed steel bars are welded. wiring.
2. Wiring process: Put the power unit hydraulic integrated machine on the ground side of the foundation groove of the pre-buried barrel, and connect the seven-core cable drawn from above the pre-embedded barrel to the motor line, battery valve line and warning light of the power unit. on-line. Accurately remember the line number or color of the seven-core cable, and the color of the wire corresponding to the motor, battery valve and warning light on the device, so as to avoid the wrong connection of the control box.
3. Equipment wiring description: The 3 lines of the motor line on the road post are on the blue motor, the brown motor, and the scribing motor are common. The terminal corresponding to the control box cannot be reversed. Two separate black wires of the battery valve are connected to the battery box of the control box and the common terminal of the battery valve, regardless of the positive and negative poles. The two wires of the warning light wire are connected to the common terminal of the control box warning light and warning light, regardless of the positive and negative poles.
4. Wiring standard: After the wire is connected, it is required to be soldered with solder. First, wrap it with plastic tape, then wrap the two layers with high-pressure waterproof tape, then wrap it with plastic tape, then wrap it with electric asphalt tape. After the line is connected, the wiring of the terminal is trimmed and fixed under the power unit to prevent the external force from breaking the wiring. After finishing the work, first connect the two wires of the power unit to the warning light, and measure the other end of the cable with a multimeter. The three wire motors are open, and the two wire battery valves are open. The two lamp wires are open, and the motor, battery valve and wire cannot be connected. After confirming, put the power unit into the pre-embedded bucket, and fix the hydraulic bolts in the clockwise direction. Button, you can use wooden sticks, etc., the remaining cable, the standard ground to the bottom of the hydraulic power unit, to avoid whether the lifting column drops against the wire, each pile is connected to the corresponding terminal row in the control box, can refer to control Box wiring diagram
Seven, backfilling
1. Make sure that the pre-buried barrel steel is welded firmly, connect the grounding wire well, first backfill the residual soil by 20 cm to prevent concrete from seeping into the underground seepage layer. When pouring concrete, the pouring height is reserved for 10 cm below the road surface. Space for restoration of original pavement and other pavement design
Eight, equipment debugging
1. According to the disassembly sequence and steps of the road pile equipment, re-install the equipment in sequence, and tighten the fixing screws of each link. After the equipment is assembled, adjust the three slide rails to ensure that the gap between the column and the floor cover is even. Make sure that the lifting is smooth and there is no jamming.
2. The infinite remote control controls the column to lift and lower. There are 3 buttons on the remote control, which are rising, falling and stopping. Use the remote control device to rise and fall, and use the stop button to stop the action of the device during the incomplete action.
3. Remote control of the manual button of the distribution box. Test the rise, fall and stop of the column through the manual button.
4. Emergency test. When the equipment is in the raised state, disconnect the power supply and use the factory-configured 12V battery to control the column to drop. If the column does not move or does not move after a period of decline, the downward pressure can be artificially delayed until the column is level with the ground.
Nine, road surface restoration and cleaning site
When the original road surface is restored, it is necessary to ensure that the ground and the bottom of the upper panel of the equipment are level. After the road surface is restored, the fence and other signs are set, and the road surface and the underground concrete are allowed to be solid before use.
Ten, warning area marking line
According to the needs of Party A or the on-site environment, draw warning signs around the lifting column, and make instructions, and prompt to stop parking or play in the warning area.
XI, customer use maintenance guidance training
After the installation and commissioning of the roadblock equipment, the technicians of our company will give the responsible person of the user unit the system working mode, operation, precautions, and equipment maintenance, systematically explain the training, training content, refer to the equipment use instructions, maintenance and maintenance. Manual, product technical guidance
Twelve, Tongda Zhi lifting column equipment use precautions:
1 Avoid frequent lifting and lowering in a short period of time, otherwise the motor will be heated and the motor will be damaged.
2 Pay attention to pedestrians when climbing, and avoid injury;
3 When the cylinder is not working properly, the rise and fall is completed, press the stop button once to avoid damage to the electrical components and not stop, so that the motor burns out.
4 If you find that the individual lifting columns are much higher than other cylinders during use, immediately press the stop button and observe if the motor is still working.
5 It is forbidden to fill the gap around the column with mud and sand debris, so as not to affect the normal lifting of the column.
6 It is forbidden to scribe on the surface of the column, causing damage to the column.
13. Daily maintenance of Tongdazhi lifting column equipment
Regular inspection and maintenance is the basis for ensuring the efficiency of the equipment Z. Please pay attention to the following points when performing equipment maintenance:
7 When the appliance is being maintained, the power should be cut off and the maintenance and inspection signs should be hung in a prominent position.
8 Check the operation of switches, buttons, indicators, etc. once a month.
9 Check the screws on each terminal and each component loosely every month.
10 Regularly perform dust removal and maintenance on the equipment surface, electrical control and hydraulic control system.
• Screw the gearing of the equipment and the mechanical fixing mechanism regularly.
• Regularly refuel, lubricate and maintain the cylinder.
XIV. Tongdazhi lifting column failure phenomenon and treatment method
1. Limit Fault
Fault phenomenon
Failure analysis
Approach
When the cylinder rises into position, it will shake
Limit failure
Check if the upper limit is at a distance or loose from the upper panel, and adjust the distance.
Can not automatically power off after rising and falling
Time relay or AC failure
Replace time relay or AC
2. Oil circuit failure
Fault phenomenon
Failure analysis
Approach
Cylinder pulsation
Lack of oil
Come on
1) The column slides down and rises slowly, and then slowly slides down.
2) Stop on the way down, slow down
Overflow valve failure
1) Adjust the overflow valve,
2) Adjust the relief valve or replace the internal spring of the valve body
The cylinder does not rise or rise and it is slow
1) Pressure relief valve failure
2) lack of oil
1) Power up to rise, lower down, flush pressure relief valve
2) Come on
Column lift is not synchronized
Inconsistent oil pressure
Adjusting hydraulic valve
3. Mechanical failure
Fault phenomenon
Failure analysis
Approach
The column does not move and rises hard
1) Mechanical deformation, large friction,
2) Uneven mechanical gap and large friction
1) Correct the mechanical structure,
2) Adjust the mechanical gap
4. Button failure
Fault phenomenon
Failure analysis
Approach
Press the remote control does not respond, the desktop button is producing
Remote control problem or battery
Replace the battery or replace the remote control
5. Short circuit fault
Fault phenomenon
Failure analysis
Approach
Power-on trip
Short circuit of the motor or short circuit of the lamp
1) Disconnect the lamp with the power cord and re-close it. If it does not trip, it indicates that the lamp is faulty, or it is waterproof, causing a short circuit, replacing the lamp strip or doing waterproof treatment.
2) After the lamp strip line is disconnected, the closing switch continues to trip, and it is judged that the motor is faulty or the line is faulty. At this time, the lifting column of each lifting column should be independently closed to find the fault problem, and after rewiring, it should be waterproofed.
6. The battery can not be controlled to fall after power failure
The battery can not be controlled to fall after power failure
1) The battery has no electricity, 2) the lifting column solenoid valve is damaged,
3) Solenoid valve line problem
Check the battery voltage requirement for more than 9V; independently test each lifting column. If only a small amount can not be lowered, it is judged that the battery valve is damaged or the solenoid valve is faulty.

PVC Bathroom Sealing Strip

PVC bathroom sealing strip is a sealing product specifically designed for bathroom environments. The following is its detailed introduction:
1、 Material characteristics
Waterproof performance
PVC bathroom sealing strips have excellent waterproof performance. It can effectively prevent water infiltration. When used in environments such as bathroom doors and shower partitions that are frequently exposed to water, it can prevent water from seeping out to the outside of the bathroom and protect the surrounding floors and walls from water erosion.
Mold proof and antibacterial properties
The damp environment in the bathroom is prone to the growth of mold and bacteria. PVC bathroom sealing strips have undergone special treatment and possess certain anti mold and antibacterial abilities, which can reduce the growth of mold and bacteria, maintain the cleanliness and hygiene of the bathroom, and extend the service life of the sealing strips.
Flexibility and adhesion
Soft texture, easy to bend and deform. This allows it to tightly adhere to the edges of various shapes of bathroom facilities, such as circular shower bar bases, irregularly shaped bathroom cabinet edges, etc., ensuring the integrity of the sealing effect.
Corrosion resistance
There may be various cleaning products and other chemicals in the bathroom, and PVC bathroom sealing strips have good resistance to these common chemicals, are not easily corroded, and can play a stable sealing role in the bathroom environment for a long time.
2、 Product application
Bathroom door seal
Installed at the edge of the bathroom door, whether it is a glass door or a wooden door. When the door is closed, the sealing strip tightly adheres to the door frame, forming a sealed barrier to prevent shower water from flowing out of the bathroom. At the same time, it can also block the diffusion of water vapor inside the bathroom to the outside, reducing the moisture on the wall outside the bathroom door.
Shower partition sealing
Used at the connection of glass partitions or simple plastic partitions in the shower room. It can ensure that the water inside the shower room does not leak outside the shower room, keep the surrounding environment dry, and improve the comfort of the shower.
Bathroom cabinet sealing
Applied to the edges of bathroom cabinets, especially those in contact with walls or floors. It can prevent water from entering the gaps between the bathroom cabinet and the wall or floor, prevent the bathroom cabinet from being affected by moisture and deformation, and extend the service life of the bathroom cabinet.

Pvc Bathroom Sealing Strip,U Channel Rubber Sealing,Pvc Door Bottom Seal,Container Door Strips

HEBEI JIEXING RUBBER SEALS CO.,LTD , https://www.jiexingrubber.com