So far, the installation of main and auxiliary equipment in the caustic soda area has completed more than 95%. Among them, the primary installation of salt water, agent configuration, membrane denitrification, liquid chlorine and packaging, hydrogen treatment and hydrogen chloride ab, chlorine treatment ab, hydrogen production equipment, etc., were completed, and the installation of secondary brine and electrolytic ab was completed. In progress, the installation of plastic pipes and titanium pipes was suspended temporarily due to the temperature.
According to the plan, the installation of secondary brine and electrolysis abb piping and chlorine treatment ab will be carried out in winter. At present, the construction unit is transporting the prepared temporary heater to the construction site, and it can be carried out after the installation is completed at the end of the month. The next step is construction.
Designed by professional hydraulic personnel ,which realized stability,durability,high efficiency,energy saving and low noise.
Neat oil,water and electric pipeline layout.
The reasonable structure is convenient for regulation and daily maintenance.
Adopt world famous brand of proportional valve,which accurately control actions of injections of injection,enabled the stable and reliable system operation.
Verification of many year's market application,optimal combination configuration.stable,reliable and durable system with the characteristics of high efficiency,energy saving,low noise and strong power.
Energy Saving Injection Moulding Machines
Energy Saving Injection Moulding Machines, Energy Saving Injection Machines ,Efficiency Energy Saving Injection,Energy Saving Plastic Injection
Ningbo Tongyong Plastic Machinery Manufacturering Co. Ltd. , https://www.tongyong-machinery.com